Site Logo
My Account | Wishlist | Basket
All Categories
Car Batteries & Accessories

Car Battery Chargers

  1. Home
  2. Car Batteries & Accessories
  3. Car Battery Chargers
Product Image

56-629 Indicator Eyelet M6 Battery Connector 0.4m Long Lead Cable By CTEK

£14.60

Part Manufacturer: CTEK. The INDICATOR - Eyelet connector is ideal for charging and checking batteries that are difficult to get to or hidden. With INDICATOR - Eyelet you have a permanent installation.

Product Reviews

Name: Review:

Related Products

CTEK 56-629 Indicator eyelet M6: practical LED indicator for immediate indication of battery charge levels

CTEK 56-629 Indicator eyelet M6: practical LED indicator for immediate indication of battery charge levels

£8.29

CTEK Battery Charger with Automatic Temperature Compensation, Black & 56-629 Indicator Eyelet M6: LED Indicator for Battery Charge Levels

CTEK Battery Charger with Automatic Temperature Compensation, Black & 56-629 Indicator Eyelet M6: LED Indicator for Battery Charge Levels

£87.29

ctek comfort connect indicator eyelet M6

ctek comfort connect indicator eyelet M6

£16.50

CTEK 56-382 Indicator Eyelet M8 Practical LED Indicator for Immediate Indication of Battery Charge Levels, Red/Black

CTEK 56-382 Indicator Eyelet M8 Practical LED Indicator for Immediate Indication of Battery Charge Levels, Red/Black

£13.93

CTEK 56-382 Indicator eyelet M8: practical LED indicator for immediate indication of battery charge levels, Red/black & 56-915 Bumper, Silicone Rubber Protection, Compatible 3.6-MXS 5.0 and CT5 Series

CTEK 56-382 Indicator eyelet M8: practical LED indicator for immediate indication of battery charge levels, Red/black & 56-915 Bumper, Silicone Rubber Protection, Compatible 3.6-MXS 5.0 and CT5 Series

£31.49

CTEK 56260 Eyelet M6 Connector Lead – 6.3mm Ring Terminal Adaptor for Chargers

CTEK 56260 Eyelet M6 Connector Lead – 6.3mm Ring Terminal Adaptor for Chargers

£9.72

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyBatteries.uk 2026